TRI Construction successfully completed the Vertex Office Tenant Improvements at Braintree Hill Office Park, Suite 3301, in 2025, delivering a fully renovated and modernized office space tailored to Vertex’s operational needs. This project was contracted by Flatley Management Company and transformed the existing suite into a high-performance workplace environment.
Scope of Work
-
General Conditions: Site supervision, permits/fees, waste removal, logistics, and temporary protections.
-
Interior Demolition: Full removal of walls, ceilings, flooring, and doors to prepare the space for new construction.
-
Carpentry & Framing: Rough framing, wood base and sills, and reworking of door and frame assemblies.
-
Doors, Glazing & Hardware: New glass partitions, sidelights, brushed stainless steel hardware, and reception entrance modifications.
-
Finishes & Interiors: Installation of drywall, soffits, insulation, acoustical ceilings, painting, carpet, and resilient flooring.
-
Electrical: Installation of new outlets, data/power floor poke-thrus, lighting relocations, and switching for open office and conference rooms.
-
HVAC: New 2.5-ton heat pump, duct modifications, piping, thermostat relocation, and system balancing.
-
Fire Protection & Life Safety: Device adjustments and additions to meet updated life safety standards.
Self-Performed Trades
-
Demolition
-
Framing & Carpentry
-
Drywall & Insulation
-
Painting & Wall Finishes
-
Ceiling Systems
-
Flooring & Carpet Installation
-
Doors, Hardware & Glazing
-
Electrical & Mechanical Work Integration
TRI Construction’s ability to coordinate multiple trades while self-performing the majority of the work ensured smooth execution, minimized disruptions, and delivered a polished, high-end office environment. This project highlights TRI’s proven expertise in managing complex tenant improvement (T.I.) projects while maintaining exceptional craftsmanship and attention to detail.