Recent Projects

The image shows a modern café counter inside Emerson College’s Lions Den dining area. The counter has a sleek, angled design with a green tile front and a white speckled countertop. Behind the counter, there are coffee machines, drink dispensers, and small equipment, with a bright yellow tiled backsplash illuminated by overhead spotlights. Three black pendant lights hang above the serving area, and large windows on the left bring in natural light, showing the exterior of nearby brick buildings. The space has light wood flooring and gray accent walls, creating a warm and inviting atmosphere.

Emerson Lions Den Security Grating

TRI Construction successfully completed the Lions Den Security Grate System project at Emerson College, located at 120 Boylston Street in…

Read More
The image shows a long, freshly renovated hallway with bright white walls and dark patterned carpet tiles in shades of gray and blue. On the right side, there are multiple doorways framed in gray leading to offices or classrooms. The ceiling is fitted with white acoustic tiles and recessed LED lighting fixtures, evenly spaced to create a well-lit, modern corridor. At the far end, a red EXIT sign is visible above the door, guiding the way out.

Emerson-Marlboro

TRI Construction successfully completed the 4th Floor Marlboro Institute Renovation at Emerson College in 2024, delivering a modernized and functional…

Read More
The photo shows the exterior of the First Priority Credit Union building. The front façade is made of dark gray brick with large ground-floor windows. Centered on the façade is the bank’s white logo, which reads “First Priority Credit Union, Est. 1924” in bold lettering with a curved line above it. Through the windows, parts of the interior are visible, including potted plants, chairs, and the same modern lighting seen in earlier images. Above the credit union, a second-story window displays a large red-and-white sign advertising “Commercial Space Available” with a phone number and QR code for leasing information. A security camera is mounted on the exterior wall.

First Priority Credit Union Branch Fit-Out

TRI Construction was awarded the branch fit-out for First Priority Credit Union at 40 William Kelly Square in East Boston,…

Read More
The image shows a newly finished concrete sidewalk directly in front of the Cutler Majestic Theatre. The sidewalk is wide, smooth, and light gray, with clean joints and utility access covers neatly integrated into the surface. On the left, the building’s stone façade features ornate trim and dark entry doors, while on the right a temporary construction fence runs along the street edge. Above the theater entrance, the marquee sign is lit, displaying “Cutler Majestic Theatre.” The overall appearance highlights the fresh completion of the sidewalk renovation.

Majestic Theater Sidewalk Improvements

TRI Construction was awarded the Majestic Theater Areaway Infill & Sidewalk Removal and Replacement project at Emerson College in 2025,…

Read More
The image shows a long office corridor with gray patterned carpet and a drop ceiling with evenly spaced recessed light panels. On the left side are a series of full-height glass office walls with glass doors framed in stainless steel. On the right side are solid wooden office doors and a red fire extinguisher mounted to the wall near the front. At both ends of the hallway, EXIT signs are visible, and natural light comes in through large windows with vertical blinds at the far end. The space is clean, modern, and fully renovated.

BHOP Vertex Office Renovations

TRI Construction successfully completed the Vertex Office Tenant Improvements at Braintree Hill Office Park, Suite 3301, in 2025, delivering a…

Read More
Rauch Building-Executive Restroom Renovations

Bentley University – Rauch Building – Executive Restroom Renovations

TRI Construction successfully completed the executive restroom renovations at Bentley University in 2024, delivering a modern and functional upgrade to…

Read More
Project: Emerson College & Harpoon Brewery Boston Common Beer Garden Client: Emerson College Location: Boston Common, Boston, MA General Contractor: TRI Construction Architect: Elkus Manfredi Project Duration: Phase One (Construction): 3 Weeks Phase Two (Deconstruction): 2 Weeks Completion: Spring 2025 Overview

Emerson College Beer Garden Mobilization & Demobilization

For the third consecutive year, TRI Construction was awarded the mobilization, transportation, and erection phase of the Emerson College &…

Read More
Norfolk Kitchen & Bath storefront illuminated in the evening

Norfolk Hardware

Norfolk Hardware Center was completed in three different phrases. This was done so that the store could stay open and…

Read More
Night view of a residential building with illuminated accessible parking spaces

Mission Park Road Reconstruction Project

The Mission Park Roadway Project, which included both the roadway and plaza reconstruction, was awarded to TRI Construction in the…

Read More